OCG23-003 DFO South Wharf Reconfiguration
近期公告
  • 03rd 十一月 2023, Site Security

    IMPORTANT - PLEASE READ

    Melbourne Cup Long Weekend - Site Security Safety Bulletin.

    附件 :
    OTTO Safety Bulletin - Site Security over the Melbourne Cup Long Weekend 2023.pdf
  • 17th 十月 2023, Working at Heights Rescue Plan

    Hi All,

    Please find attached a Working at Heights Rescue Plan document for your reference. It outlines -

    - Relevant information to be considered and included in a Working at
    Heights Rescue Plan.
    - A Rescue Plan Form
    - Safety Equipment to be included in a Working at Heights Rescue
    Kit.

    I have also updated the HSEQ Construction Management Plan document to include this information.

    Regards,
    Sarah McNair
    Office Manager

    附件 :
    Working at Heights Rescue Plan.pdf
  • 20th 三月 2023, Dtech Concrete Scanning Report

    Results from concrete scanning conducted on the ground level and level 1 for steel installation and penos on level 1 at DFO South Wharf on the 20/03/23.

    附件 :
    CS8754-OTTO CG-DFO SOUTH WHARF REPORT-20MAR23.pdf
现场天气预报
当前现场天气

不可用


观测信息来自 - 不可用
时区 - 澳大利亚东部标准时间
预测 - 星期日、1 三月

Showers.
最低: 20C 最大: 24C
可能有雨。: 95%
预计降雨: 7 至 30mm


预测信息来自 - Bureau of Meteorology
预测位置 - Melbourne、VICTORIA
时区 - 澳大利亚东部标准时间
明天 - 星期一, 2 三月

Shower or two.
最低: 19C 最大: 22C
可能有雨。: 70%
预计降雨: 0 至 6mm


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

;