OCG23-003 DFO South Wharf Reconfiguration - Herkese Açık Proje Sahası
-
03rd Kasım 2023, Site Security
IMPORTANT - PLEASE READ
Ekler :
Melbourne Cup Long Weekend - Site Security Safety Bulletin.
OTTO Safety Bulletin - Site Security over the Melbourne Cup Long Weekend 2023.pdf
-
17th Ekim 2023, Working at Heights Rescue Plan
Hi All,
Ekler :
Please find attached a Working at Heights Rescue Plan document for your reference. It outlines -
- Relevant information to be considered and included in a Working at
Heights Rescue Plan.
- A Rescue Plan Form
- Safety Equipment to be included in a Working at Heights Rescue
Kit.
I have also updated the HSEQ Construction Management Plan document to include this information.
Regards,
Sarah McNair
Office Manager
Working at Heights Rescue Plan.pdf
-
20th Mart 2023, Dtech Concrete Scanning Report
Results from concrete scanning conducted on the ground level and level 1 for steel installation and penos on level 1 at DFO South Wharf on the 20/03/23.
Ekler :
CS8754-OTTO CG-DFO SOUTH WHARF REPORT-20MAR23.pdf
Geçerli Saha Hava Durumu
Kullanılamaz
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Pazar, 1 Mart
Showers.
Min: 20C Maks: 24C
Yağmur İhtimali: 95%
Beklenen Yağmur: 7 kime 30mm
Tahmin Konumu - Melbourne, VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Pazartesi, 2 Mart
Shower or two.
Min: 19C Maks: 22C
Yağmur İhtimali: 70%
Beklenen Yağmur: 0 kime 6mm
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.